单选题
Inspection and modification per this bulletin will reduce the possibility of stress corrosion cracks which would require replacement of the stabilizer center section front spar.
A
This bulletin should be followed to inspect and modify the stress corrosion cracks which is caused by replacing the stabilizer center section front spar.
B
The stabilizer center section front spar would be replaced due to the stress corrosion cracks. However, if the spar is inspected and modified per this bulletin, the cracks will be reduced.
C
During inspection and modification per this bulletin, the stress corrosion cracks are found after replacement of the stabilizer center section front spar.
答案解析
正确答案:B
