AI智能整理导入 AI智能整理导入
×
首页 题库中心 两年卖shen合同上半部分 题目详情
CA2749C7FC7000015D88CD60A2E0102B
两年卖shen合同上半部分
939
单选题

Inspection and modification per this bulletin will reduce the possibility of stress corrosion cracks which would require replacement of the stabilizer center section front spar.

A
This bulletin should be followed to inspect and modify the stress corrosion cracks which is caused by replacing the stabilizer center section front spar.
B
The stabilizer center section front spar would be replaced due to the stress corrosion cracks. However, if the spar is inspected and modified per this bulletin, the cracks will be reduced.
C
During inspection and modification per this bulletin, the stress corrosion cracks are found after replacement of the stabilizer center section front spar.

答案解析

正确答案:B
两年卖shen合同上半部分

扫码进入小程序
随时随地练习

关闭
专为自学备考人员打造
试题通
自助导入本地题库
试题通
多种刷题考试模式
试题通
本地离线答题搜题
试题通
扫码考试方便快捷
试题通
海量试题每日更新
试题通
欢迎登录试题通
可以使用以下方式扫码登陆
试题通
使用APP登录
试题通
使用微信登录
xiaochengxu
联系电话:
400-660-3606
xiaochengxu