相关题目
14 The effects of corrosion have mbt been considered in the rationale in selecting inspection times or in the effects on the fatigue stresses.
13. The firststep should always be JobSet-Up, and the last should be Close-Up or Clean-Up.
12. Procedures shall be prepared in reference number sequence within each Chapter with proper major and minor subject heads,without the necessity of each procedure starting at the top of a new page.
11. Other information may be displayed on the cover.
10 .MOVE THE THROTTLE AFT
9 .Moment divided by a constant is used to simplify balance calculations by reducing the number of digits
8. Lubricants for the engine and the auxiliary equipment are the same
7. It isalexpected that the manufacturers of major components will provide maintenance,troubleshooting,inspection and repair data in the format of this specification
6 .In these conditions,neither the mechanical nor the electrical pitch trim systems will operate
5 In designing schematic diagrams,it maybe necessary to compromise between detail necesary to in ake the diagran self-explanatory and the simplicity essential for ease of reading and understanding.
