等第一层油漆完全干透后再涂第二层。
答案解析
相关知识点:
等首层漆干,再涂第二层
相关题目
Operate the jack slowly, until the NLG shock absorber is compressed.
The present Service Bulletin List is compiled at manual level.
To prevent heat damage to the slats, the ground test stop automatically after 30 seconds.
To make pin removal easier, manually turn the canopy in one direction and then in the other.
Measure the time necessary for the silica gel to absorb the moisture.
If the humidity changes frequently, put a cover on the unit.
Do the leak test.
Tell person A to remove the chocks.
Two resolvers measure the position of the fuel metering valve.
Fuel flows from the HMU to the fuel flow transmitter.
