The AC electrical power distribution on board is carried out in several steps: from the different sources towards the main AC busbars; then, from the main AC busbars, either directly towards important consumers (pumps, galleys...), or towards the associat
答案解析
相关知识点:
飞机交流配电分多步进行
相关题目
In addition, this section may contain a comprehensive list of equipment available for installation by the manufacturer.
Torquemeter is an indicating system that displays the output torque available on the propeller shaft.
Procedures shall be provided for coping with cases of smoke or fire in the cabin or from an engine.
If the landing gear doors are made as an integral structure they could be shown only in chapter 32.
When you remove the shroud, be careful not to cause damage to the flange assembly.
The torsion link assembly can transmit torsional loads from the axle to the shock strut.
Use a different construction to write a sentence when a word for word replacement is not sufficient.
If you find an unusual quantity of air from the vent mast, do a system test.
A mechanic opening a door without obeying the specified safety precautions can easily cause injury to persons standing near the door.
Identify the disassembled parts with tags, this method will help you during the subsequent assembly procedures.
