相关题目
During night operation, make sure that the panel lights are dim.
Do a test to find if the management unit transmits the data.
The related caution light must go off after 30 seconds.
Examine the opening for cracks that start at its corners.
Make sure that there is continuous movement of the probe.
Remove the sensor to get access to the adjacent structure.
Operate the dimmer switch and make sure that the intensity of the light changes.
If the filler bonds to the tool, make the tool moist with cold water.
Apply weight on the surface of the patch to make sure that the parts bond correctly.
If the microswitch becomes unserviceable, do the deactivation procedure of the actuator to prevent damage to the valve.
