APP下载
首页
>
职业技能
>
设备系统操作理论翻译
搜索
设备系统操作理论翻译
题目内容
(
单选题
)
3159. 一个控制杆控制活门的位置。

A、 A lever controls the valve position.

B、 A lever controls the valve open and close.

C、 A stick rotates the valve position.

答案:A

设备系统操作理论翻译
2107. You can use equivalent alternatives for these items
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44ba-ecdd-c0b8-ef8d402da900.html
点击查看题目
1023. This installation procedure is typical for this type of fastener
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d1-7180-c0b8-ef8d402da900.html
点击查看题目
2885. Move the rod in the opposite direction
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d3-64fc-c0b8-ef8d402da900.html
点击查看题目
729. This figure shows the structure of the system
https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b40-d3c5-c0b8-ef8d402da900.html
点击查看题目
2919. Technical verbs are words that give instructions and information in specified technical and operational contexts
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d3-d21d-c0b8-ef8d402da900.html
点击查看题目
1232. 确保紧固件头部与蒙皮齐平
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d4-7301-c0b8-ef8d402da900.html
点击查看题目
3193. This Cap has been prepared with the intent to expand present inspection requirements as a further assurance of the ability of the airplane to perform within the limits of the original certification
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e36-42c0-c0b8-ef8d402da900.html
点击查看题目
2871. FLUSH THE FILTER WITH HOT WATER
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d3-069a-c0b8-ef8d402da900.html
点击查看题目
499. 工具随后可用于安装程序。
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf9-b792-c0b8-ef8d402da900.html
点击查看题目
1646. MAKE SURE THAT THE CAPTAIN'S BOOMSET ( )SIGNALS CORRECTLY
https://www.shititong.cn/cha-kan/shiti/0009ffad-f67d-7d17-c0b8-ef8d402da900.html
点击查看题目
首页
>
职业技能
>
设备系统操作理论翻译
题目内容
(
单选题
)
手机预览
设备系统操作理论翻译

3159. 一个控制杆控制活门的位置。

A、 A lever controls the valve position.

B、 A lever controls the valve open and close.

C、 A stick rotates the valve position.

答案:A

设备系统操作理论翻译
相关题目
2107. You can use equivalent alternatives for these items

A. 你可以对这些条款使用备用替换。

B. 你可以对这些条款使用不同的替代。

C. 你可以对这些条款使用等效的替代。

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44ba-ecdd-c0b8-ef8d402da900.html
点击查看答案
1023. This installation procedure is typical for this type of fastener

A. 此安装程序是此类松紧装置类型的安装程序。

B. 此安装程序是此类紧固件的典型安装程序。

C. 此安装过程是此类紧固件的安装类型。

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d1-7180-c0b8-ef8d402da900.html
点击查看答案
2885. Move the rod in the opposite direction

A. 向反方向移动杆

B. 逆时针移动杆

C. 移动杆至对应方向

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d3-64fc-c0b8-ef8d402da900.html
点击查看答案
729. This figure shows the structure of the system

A. 该数字表明了系统的规模

B. 该图片显示了系统的结构

C. 该形状说明了系统的形式

https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b40-d3c5-c0b8-ef8d402da900.html
点击查看答案
2919. Technical verbs are words that give instructions and information in specified technical and operational contexts

A. 技术动词在特定的技术与操作语境中给出指示和信息。

B. 技术动词用于描述指示和信息,以适用于特定的技术与操作环境。

C. 技术动词是指示性的词汇,提供有关特定技术与操作的信息。

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d3-d21d-c0b8-ef8d402da900.html
点击查看答案
1232. 确保紧固件头部与蒙皮齐平

A. Make sure that the bolt heads are attached to the skin.

B. Make sure that the screw heads are connected with the metal

C. Make sure that the fastener heads are flush with the skin.

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d4-7301-c0b8-ef8d402da900.html
点击查看答案
3193. This Cap has been prepared with the intent to expand present inspection requirements as a further assurance of the ability of the airplane to perform within the limits of the original certification

A. 编写本CAP旨在扩大现有的检查要求,以进一步保证飞机在初始认证范国内的性能。

B. 本CAP准备延伸目前的检查要求,以更远地保证飞机在初始认证极限内的性能能力。

C. 准备本CAP的要求是想要加强现有的检查,作为飞机在原认证范围内执行能力的更好保证。

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e36-42c0-c0b8-ef8d402da900.html
点击查看答案
2871. FLUSH THE FILTER WITH HOT WATER

A. RINSE FILTTER IN HOT RUUNING WATER.

B. FLASH THE FILTER WITH HOT WATER.

C. FLESH THE HOT WATER WITH FILTER.

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d3-069a-c0b8-ef8d402da900.html
点击查看答案
499. 工具随后可用于安装程序。

A. Tool is subsequently available for the installation task.

B. Tool is subsequently available for the installation procedure.

C. Tool is adjacently available for the installation procedure.

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf9-b792-c0b8-ef8d402da900.html
点击查看答案
1646. MAKE SURE THAT THE CAPTAIN'S BOOMSET ( )SIGNALS CORRECTLY

A. SUPPLYS

B. RECEIVES

C. ACCEPTS

https://www.shititong.cn/cha-kan/shiti/0009ffad-f67d-7d17-c0b8-ef8d402da900.html
点击查看答案
试题通小程序
试题通app下载