相关题目
2132. The mix chamber is a cylindrical duct assembly consist of an exterior shroud and interior sleeve
2131. 本部分测试的目的足为工作提供指导。
2130. Manufacturers may omit systems not applicable to their product
2129. 本系统并不会取代不包括在CAP内的断开的正常通讯渠道
2128. 不要让压力小于(或大于)20psi
2127. 在防滑模块与驻车制动模块之回的高压正常制动回路系统中,建议采用镀镉耐腐蚀钢或镀镉钢接头替代铝接头。
2126. To make or become larger as a result of pressurization by a gas
2125. A form of printing shall be used which results in a black image suitable for reproduction
2124. There is no indication of single loop operation in the flight compartment until you do the OVHT/FIRE test
2123. De-icing is a procedure that removes ice and snow from the aircraft surfaces
