709. the flow control devices within the system such as check valves, fuel pumps, accumulators, and relays should be included
答案解析
相关题目
2654. WHEN GASES ARE HEATED,THEY ( )
2653. The normal procedures check list should be in cdhcise,abbreviated form and designed to remind pilots of items to check without providing details concerning the operation of any system
2652. Even though large illustrations are laid out horizontally, it is preferred to have indexing callouts and titles read vertically
2651. In the configuration, the hydraulic pressure bypasses the valve
2650. 清洗系统
2649. 所有传感器都提供显示的数据。
2648. 打开控制活门(13)和(20),并操作手摇泵(17)以排空加注系统。
2647. When it is necessary to order any wire bundles from Boeing, operators should provide the base wire bundle number (61-30396 in this case) and tail number of the airplane where the bundle is to be installed on
2646. Determine which door has failed to close
2645. 在整个手册中,每个单独系统应使用相同的编码。
