相关题目
2690. Make shure that the fastener heads are flush with the skin
2689. Install the sealing ring in the groove of the spherical bearing
2688. Those instructions are necessary to carry out the scheduled sevring
2687. 泵安装在液压马达后面
2686. 确保接下来用于安装程序的工具是可用的。
2685. Airplanes modified by STC are not the responsibility of ABC
2684. Remove of the AC Current Transformer
2683. Some fixed or variable fairings such as those on the nose and tail and between the fuselage and the wing and the stabilizers are aerodynamic fairings
2682. Pull the transparent plastic collar away from the nose of the electrical latch
2681. Make sure that the door is flush with the adjacent surfaces
