相关题目
单选题
2695. Make sure that the values agree with the tolerances
单选题
2694. 对甚高频导航系统执行排故程序。
单选题
2693. If the fault occurs regularly, do the troubleshooting of the system
单选题
2692. Manually push the ram air turbine in the direction of the retracted position
单选题
2691. If you do not install the rigging pin, the elevators will move down when there is no pressure in the system
单选题
2690. Make shure that the fastener heads are flush with the skin
单选题
2689. Install the sealing ring in the groove of the spherical bearing
单选题
2688. Those instructions are necessary to carry out the scheduled sevring
单选题
2687. 泵安装在液压马达后面
单选题
2686. 确保接下来用于安装程序的工具是可用的。
