相关题目
单选题
2952. This Section must set forth each mandatory replacement time, structural inspection interval, and related structural inspection procedure required for type certification
单选题
2951. Make sure that the doors are closed during the pressurization test
单选题
2950. 本章介绍了记录、存储或计算来自不相关系统数据的组件。
单选题
2949. 如适用,提供增压,加热,冷却,湿度控制,过滤和处理用于通风增压密封机身内部区域的空气的装置和组件
单选题
2948. 在无保护的表面上涂抹两层密封剂。
单选题
2947. 副翼的通道从发射机接收输入信号
单选题
2946. 确保罗盘系统1和罗盘系统2是同步的
单选题
2945. 所有的修改都要得到设计部门的批准。
单选题
2944. ( ) THE ENGINE
单选题
2943. The manufacturer may establish procedures to provide feedback( )on unairworthy conditions( )that were discovered when complying
