524.The rules of construction followed in the preparation of this Specification are the same as generally used by the FAA in the preparation of its rules( )
答案解析
相关题目
413.让部件的温度下降直到其与周围的温度一致。( )
412.Unless the manufacturer's instructions tell you differently, do the procedure that fallows( )
411.Do an inspection of the component interface and the adjacent area ( )
410.The localizer course is aligned with the centerline of the runway,and the glideslope path is at a constant angle to the threshold of the runway ( )
409.Each multi-mode receiver [MMR]sends runway course and ILS deviation data to the on-side AFDC ( )
408.如果发现断线,请修理它们。 ( )
407.The quantity of fluid in each system is shown on the EICAS HYD page ( )
406.Any adjustments/tests that are necessary as part of installation or reactivation procedures shall be in the text in proper sequence( )
405.Move the probe upstream and measure the temperature again ( )
404.The approved words were selected because they were simple and easy to recognize ( )
