APP下载
首页
>
外语语音
>
仿真知识练习题库
搜索
仿真知识练习题库
题目内容
(
单选题
)
3232. During the soldering procedure, use a protective shield ( )

A、 在焊接过程中,使用保护罩。

B、 在软焊程序过程中,使用防护罩。

C、 在焊接过程中,穿戴防护服。

答案:A

仿真知识练习题库
278.ABC has determined that providing additional inspection requirements is prerequisite to further ensure that the airplanes can continue to carry the design loads it was originally certified for based on inspections, tests, and analyses because of the varied mission the airplanes performed, type of care given, and age and utilization rates ( )
https://www.shititong.cn/cha-kan/shiti/0009e48c-3753-c0c7-c0de-df9bd8272d00.html
点击查看题目
1804. The blankets have a waterproof covering and their installation in a shingled configuration prevents condensation from leaking into the compartment( )
https://www.shititong.cn/cha-kan/shiti/0009e48c-3a2a-57f7-c0de-df9bd8272d00.html
点击查看题目
612.If you cannot hear the alarm, adjust the volume control ( )
https://www.shititong.cn/cha-kan/shiti/0009e490-b9e6-38ec-c0de-df9bd8272d00.html
点击查看题目
2563. 为得到更多的推力,需要更多的燃油。 ( )
https://www.shititong.cn/cha-kan/shiti/0009e48c-3b91-1939-c0de-df9bd8272d00.html
点击查看题目
218.Emergency Procedures and other pertinent information necessary for safe operations shall be provided for emergencies peculiar to particular airplane design, operating or handling characteristics( )
https://www.shititong.cn/cha-kan/shiti/0009e48c-3735-fda6-c0de-df9bd8272d00.html
点击查看题目
616.有些工作或流程由几个基本操作组成每个操作下面有若干小步骤或工作项。 ( )
https://www.shititong.cn/cha-kan/shiti/0009e48c-37f3-db98-c0de-df9bd8272d00.html
点击查看题目
786.Adjust the linkage again after the inspection ( )
https://www.shititong.cn/cha-kan/shiti/0009e490-ba36-f1ea-c0de-df9bd8272d00.html
点击查看题目
804.收到,我们可以推出 ( )
https://www.shititong.cn/cha-kan/shiti/0009e48c-384e-e5c9-c0de-df9bd8272d00.html
点击查看题目
778.修订-修订意味着对现有手册中的信息进行修改。对基础文件进行修改时,提供相应的修改页和相关的有效页清单。( )
https://www.shititong.cn/cha-kan/shiti/0009e48c-3842-b9f3-c0de-df9bd8272d00.html
点击查看题目
60.本节必须列出型号合格审定所需的每个强制更换时间、结构检验间隔和相关的结构检查程序。( )
https://www.shititong.cn/cha-kan/shiti/0009e48c-36eb-02fa-c0de-df9bd8272d00.html
点击查看题目
首页
>
外语语音
>
仿真知识练习题库
题目内容
(
单选题
)
手机预览
仿真知识练习题库

3232. During the soldering procedure, use a protective shield ( )

A、 在焊接过程中,使用保护罩。

B、 在软焊程序过程中,使用防护罩。

C、 在焊接过程中,穿戴防护服。

答案:A

分享
仿真知识练习题库
相关题目
278.ABC has determined that providing additional inspection requirements is prerequisite to further ensure that the airplanes can continue to carry the design loads it was originally certified for based on inspections, tests, and analyses because of the varied mission the airplanes performed, type of care given, and age and utilization rates ( )

A.  ABC has determined the varied mission the airplanes performed , type of care given , and age and utilization rates because providing additional inspection requirements is prerequisite to further ensure that the airplanes can continue to carry the design loads it was originally certified for based on inspections, tests, and analyses.

B.  Because of the varied mission the airplanes performed, type of care given, and age and utilization rates, ABC has determined , based on inspections , tests , and analyses , that it is prerequisite to provide additional inspection requirements to further ensure that the airplanes can continue to carry the design loads it was originally certified for.

C.  To further ensure that the airplanes can continue to carry the design loads it was originally certified for.owing to the diversified mission the airplanes performed, type of care given,and age and utilization rates, ABC has determined that providing additional inspection requirements is necessary based on inspections, tests, and analyses.

https://www.shititong.cn/cha-kan/shiti/0009e48c-3753-c0c7-c0de-df9bd8272d00.html
点击查看答案
1804. The blankets have a waterproof covering and their installation in a shingled configuration prevents condensation from leaking into the compartment( )

A.  The isolation blanket has a waterproof layer that is installed in a brick configuration to prevent leakage of condensed water into the carriage.

B.  The insulation blankets have a waterproof layer and are installed in a tiled configuration to prevent leakage of condensed water into the compartment.

C.  The insulating blankets have a watertight layer which is mounted in a shingled configuration to protect leakage of water condensation into the compartment.

https://www.shititong.cn/cha-kan/shiti/0009e48c-3a2a-57f7-c0de-df9bd8272d00.html
点击查看答案
612.If you cannot hear the alarm, adjust the volume control ( )

A.  如果无法捕捉警报器时,需调整音量控制。

B.  如果无法听到警告声时,需调整音量控制。

C.  如果无法听到警告声时,需调整放大控制。

https://www.shititong.cn/cha-kan/shiti/0009e490-b9e6-38ec-c0de-df9bd8272d00.html
点击查看答案
2563. 为得到更多的推力,需要更多的燃油。 ( )

A.  To get more fuel, we need more oil.

B.  Get more fuel to get more drag.

C.  We need more fuel in order to get more thrust.

https://www.shititong.cn/cha-kan/shiti/0009e48c-3b91-1939-c0de-df9bd8272d00.html
点击查看答案
218.Emergency Procedures and other pertinent information necessary for safe operations shall be provided for emergencies peculiar to particular airplane design, operating or handling characteristics( )

A.  对于特定飞机设计、操作或操纵特征的紧急情况,应提供安全操作所需的紧急程序和其他相关信息。

B.  对干特定飞机设计、操作或操纵特征的应急部件,应提供安全操作所需的紧急程序和其他关键信息。

C.  应提供安全操作所需的紧急程序和其他非正常信息,这些信息对应于不同的特定飞机设计、操作或操纵特征的紧急情况。

https://www.shititong.cn/cha-kan/shiti/0009e48c-3735-fda6-c0de-df9bd8272d00.html
点击查看答案
616.有些工作或流程由几个基本操作组成每个操作下面有若干小步骤或工作项。 ( )

A.  Some jobs or processes consist of several basic operations, with a number of minor steps or work items under each.

B.  Some basic operations with a few small steps or work items are included in some work or processes.

C.  Some jobs or processes constitute a few basic operations, with several minor steps or work items under each.

https://www.shititong.cn/cha-kan/shiti/0009e48c-37f3-db98-c0de-df9bd8272d00.html
点击查看答案
786.Adjust the linkage again after the inspection ( )

A.  检查后再次拉长连杆。

B.  测试后再次移动连杆。

C.  检查后再次调节连杆。

https://www.shititong.cn/cha-kan/shiti/0009e490-ba36-f1ea-c0de-df9bd8272d00.html
点击查看答案
804.收到,我们可以推出 ( )

A.  roger that, we can release.

B.  roger that, we can dispatch.

C.  Roger, we can push back.

https://www.shititong.cn/cha-kan/shiti/0009e48c-384e-e5c9-c0de-df9bd8272d00.html
点击查看答案
778.修订-修订意味着对现有手册中的信息进行修改。对基础文件进行修改时,提供相应的修改页和相关的有效页清单。( )

A.  REVISION-A revision means a modification of information in an existing manual. Appropriate revision pages and related effectivity page lists will be provided when amending the basic document.

B.  REVISION-A revision means a modification of information in an existing manual. Appropriate revision pages and related effectivity page lists will be provided when deleting the basic document.

C.  REVISION-A revision means a modification of information in an existing manual. Appropriate revision pages and related effectivity page lists will be provided when replenishing the basic document.

https://www.shititong.cn/cha-kan/shiti/0009e48c-3842-b9f3-c0de-df9bd8272d00.html
点击查看答案
60.本节必须列出型号合格审定所需的每个强制更换时间、结构检验间隔和相关的结构检查程序。( )

A.  This section must provide the corresponding structural inspection procedures required for each mandatory replacement time, structural inspection interval and type qualification.

B.  This section must list the relevant structural inspection procedures required for each mandatory replacement time , structural inspection interval and model qualification validation.

C.  This section must set forth each mandatory replacement time, structural inspection interval, and related structural

inspection procedure required for type certification.

https://www.shititong.cn/cha-kan/shiti/0009e48c-36eb-02fa-c0de-df9bd8272d00.html
点击查看答案
试题通小程序
试题通app下载