请注意,飞机的改装或修理工作必须由持照人员完成。
答案解析
相关知识点:
飞机改装修理,须持照人员做
相关题目
Auxiliary fuel tanks are normally removable tanks.
Outlet pressure of control unit fails to stabilize at proper pressure.
Make sure the area for test is free of any people.
Set the STANDBY POWER switch on the P5-5 panel to the OFF position.
Guarantee that all means we use meet the requirement of airworthiness.
Use proper equipment to do the inspection, instead of visual check.
Keep quiet to avoid missing the sound of signal.
No one is allowed to access the airplane during its functional test.
Perform preliminary inspection of all articles that are maintained.
Label the tabs with section numbers or titles.
