这些咨询通告提供了关于制造商和所有者/运营商持续适航要求的具体信息。
答案解析
相关知识点:
通告提供适航要求,选咨询通告
相关题目
Interconnects to other systems should be plainly noted.
Make sure that the fluid that goes through the tube has no bubbles.
Make sure that the doors are closed during the pressurization test.
Make sure that there is tension in the lockwire.
The time between clicks must be 20 seconds.
Measure the time necessary for the pressure to decrease.
To install the indicator, tilt it rearward.
The tolerance is plus or minus 0.2 mm.
A number in the top left corner of the display refers to a related page.
The vertical stabilizer is installed on the top of the fuselage tail section.
