单选题
The installation changed the routing of the cable loom.
A
The routing of the cable loom may have been altered by the installation.
B
The routing of the cable loom may have been held by the installation.
C
The routing of the cable loom may have been defended by the installation.
答案解析
正确答案:A
相关知识点:
安装改变电缆路由考点
相关题目
单选题
Apply grease to the V-clamp before you install it.
单选题
Lubricate the V-clamp with grease before you install it.
单选题
Gradually open the cocks on the recharging unit.
单选题
Turn the potentiometer until the light is dim.
单选题
Apply the patch with the matt side against the glossy surface.
单选题
The motor stops when the flaps are at the end of their travel.
单选题
If the temperature decreases to less than zero, drain the water system.
单选题
If the lever moved accidentally, do the test again.
单选题
The fueling hose must not hit the edge of the tank.
单选题
Support struts hold the floor structure in position.
