相关题目
151、Procedures shall be prepared in reference number sequence within each chapter with proper major and minor subject heads,without the necessity of each procedure starting at the top of a new page.
150、Measure the depth of the dent with a straightedge and feeler gauges.
149、Make sure that the doors are closed during the pressurization test.
148、It is not permitted to install more than two washers for each bolt
147、In this example,we calculated the data applicable only to a Type unit.
146、In these conditions, the mechanical and electrical pitch trim systems will not operate.
145、In the latter case, the title shall be Pilot's Operating Handbook"."
144、If the tower does not respond, use a different channel.
143、If the bracket touches the plate,remove the unwanted material with file.
142、If possible, always tell your reader what can occur if the safety instruction is not obeyed.
