71、Before you do this procedure,engage the ramp service door safety connector pin.
答案解析
解析:
相关知识点:
操作前插上门安全连接销
相关题目
152、Questions of compliance with the Specification shall be referred to the General Aviation Manufacturers Association( ) and the Federal Aviation Administration( ) for resolution.
151、Procedures shall be prepared in reference number sequence within each chapter with proper major and minor subject heads,without the necessity of each procedure starting at the top of a new page.
150、Measure the depth of the dent with a straightedge and feeler gauges.
149、Make sure that the doors are closed during the pressurization test.
148、It is not permitted to install more than two washers for each bolt
147、In this example,we calculated the data applicable only to a Type unit.
146、In these conditions, the mechanical and electrical pitch trim systems will not operate.
145、In the latter case, the title shall be Pilot's Operating Handbook"."
144、If the tower does not respond, use a different channel.
143、If the bracket touches the plate,remove the unwanted material with file.
