相关题目
951、Procedures shall be prepared in reference number sequence within each Chapter with proper major and minor subject heads, without the necessity of each procedure starting at the top of a new page were
950、On schematic diagrams such as electrical,where a large number of items are listed,the items shall be presented in a logical order such as the sequence of the arrangement of the items in the airplane or in the schematic diagram
949、A fuel pump is installed in zone 10.
948 、Maintenance Practice which are a combination of servicing, removal/installation, adjustment/test, inspection /check, cleaning/ painting,and approved repairs should follow the Troubleshooting Section
947、在与修订部分相对的页面的左边,使用马克垂直线来标识对黏图的修订或使用”指向手势”( )。
946、要校准测试装置,参阅制造商的说明。
945、The backside of the title page should be left blank to avoid the need for revision and potential loss of the inserted airplane serial and registration numbers.
944、If you cannot push a needle or equivalent through the inspection hole,then rod eye is deep enough.
943、If the microswitch becomes unserviceable,do the deactivation procedure of the actuator to prevent damage to the valve.
942、The Listing of CAP Inspections contains all Continuing Airworthiness Program Inspections in the CAP, in numerical order by CAP inspection number, with full title, date, and effectivity and inspection compliance.
