相关题目
62.MAKE SURE THAT YOU CAN () THE OIL LEVEL THROUGH THE SIGHT GAUGE.
61.Procedures shall be prepared in reference number sequence within each Chapter with proper major and minor subject heads, without the necessity of each procedure starting at the top of a new page.
60.If you do not do this at the same time, the alignment pins will get caught.
59.Continuing Airworthiness Program Inspections usually consist of two pages: one text page and one illustration page
58.IF ACID (), CLEAN THE AREA.
57.Additionally,items not previously considered for inclusion in the CAP may be uncovered through operator inspections.
56.接近 1 号液压系统的储压器。
55. Identify revisions, additions and deletions by a vertical black line along the outside of the page (or the column side opposite the gutter on two column pages) opposite only that portion of the printed matter that was changed.
54.WHEN YOU INSTALL THE ANTENNA, THE ALIGNMENT ARROW MUST POINT FORWARD.
53.测量硅胶吸收水分所需的时间。
