674、This CAP has been prepared with the intent to expand present inspection requirements as a further assurance of the ability of the airplane to perform within the limits of the originals certification
答案解析
解析:
相关题目
649、The generators supply a three-phase voltage.The frequency of this voltage increases when the generator rotor speed increases.
648、The gas charging valve is on the top of the shock strut of the nose landing gear.
647、The function and operation of each unit in the system should be described as well as the location of the units.
646、The first step should always be job Set-up and last should be Close Up or Clear-Up.
645、The elevators must move symmetrically.
644、The control units is installed aft of the cockpit.
643、The color of the indicator changes to green.
642、The Check list may also contain supplemental information pertinent to the operation of the airplane.
641、The center of gravity(is the point an airplane would balance if suspended.
640、The CAP will address primary and secondary airframe components.and primary and secondary systems to accomplish the stated objective of continued airworthiness