1024、The second method does not require pressurization of the pneumatic crossover manifold, but utilizesan external air source connected to the air charging valve manifold to pressurize the reservoirs for groundmaintenance. 第二种方法不需要对气动交叉管汇加压,而是利用一个外部气源连接到空气充注阀管汇,对储气罐加压,用于地面维护
答案解析
相关知识点:
二法无需,交叉管汇加压
相关题目
464、This system does not supersede the normal channels of communication for items not covered by the CAP
463、The precision of this adjustment is important
462、The precision of this adjustment is important
461、紧急程序检查单应简明扼要,旨在提醒飞行员检查的项目,但不应提供任何系统操作的细节
460、The emergency procedures check list(should be in concise, abbreviated form designed to remind pilots of items to checkwithout providing details concerning the operation of any system.
459、Operate the unit for two cycles to remove air from the lines.
458、Operate the unit for two cycles to remove air from the lines.
457、Once designed and approved, the establishment of thorough maintenance procedures is a musts
456、Once designed and approved, the establishment of thorough maintenance procedures is a must.
455、once designed and approved, the establishment of thorough maintenance procedures is a must.
