827、本系统并不会取代不包括在 CAP 内的断开的正常通讯渠道
答案解析
相关知识点:
系统不代正常渠,A句说法要记住
相关题目
661、The schematic diagrams should include generators, tanks and reservoirs that are considered to be the starting points ofthe flow
660、The repair limits are not given because special equipment is necessary.
659、The purpose of Such terms is to provide definitions which are of practical value for technical communication.
658、The procedures shall clearly describe the step by step operation in a logical work flow sequence as necessary to gainaccess to and subsequently remove the hardware or install the hardware. were
657、The primary function of the hydraulic pressure system is to supply pressure for the operation of the flight controls.
656、The potable water system is used to store and deliver fresh drinking water
655、The operational test for the HFS-900D transceivers is a BITE test which does a check of the internal functions of the HFtransceiver
654、The navigation lights change from dim to bright.
653、The manufacturer may establish procedures to provide feedback on unairworthy conditions.
652、the load is applied axially.
