1024、The second method does not require pressurization of the pneumatic crossover manifold, but utilizes
an external air source connected to the air charging valve manifold to pressurize the reservoirs for ground
maintenance.
第二种方法不需要对气动交叉管汇加压,而是利用一个外部气源连接到空气充注阀管汇,对储气罐加压,
用于地面维护
charging valve manifold to pressurize the reservoirs for ground maintenance is the second method.
connected to the air charging valve" manifold to pressurize the reservoirs for ground maintenance.
an external air source connected to the air charging valve manifold to pressurize the reservoirs for ground
maintenance.
答案解析
相关题目
251、The selection of data by the handbook producer, to be included in this Section shall be governed by the
concepts contained in the preface of this Specification.
手册生产者对本节所包含的数据的选择应受本规范序言中所包含的概念的约束。
250、lt is the responsibility of the airplane owner and the pilot to insure that the airplane is loaded properly
249、Lower the antenna to get access to the cable connector.
248、在使用危险品之前,请遵守以下注意事项、
247、Do the procedure that follows.
246、确保襟翼位置对称。
245、Disconnect the cable from the rear side of the instrument.
244、Remove the cover assembly to get access to the lamp assembly. 拆卸盖子总成以接近灯总成。
243.如果底漆层损伤,进行修理。
242、确保释放放气按钮开关(ON 标志灯熄灭)
