相关题目
61.Procedures shall be prepared in reference number sequence within each
60.If you do not do this at the same time, the alignment pins will get
caught.
59.Continuing Airworthiness Program Inspections usually consist of two
pages、 one text page and one illustration page
58.IF ACID ( ), CLEAN THE AREA.
57.Additionally,items not previously considered for inclusion in the CAP
may be uncovered through operator inspections.
56.接近 1 号液压系统的储压器。
55.Identify revisions, additions and deletions by a vertical black line
along the outside of the page ( ) opposite only that portion of the printed matter
that was changed.
54.WHEN YOU INSTALL THE ANTENNA, THE ALIGNMENT ARROW MUST POINT FORWARD.
53.测量硅胶吸收水分所需的时间。
52.The schematic diagram should tend to deal with an overall system rather
than with subsystems, e.g., the air conditioning system rather than a
compressor or blower within the air conditioning system.
