937 . Maintenance Practices which are a combination of servicing, removal installation, adjustment/ test
inspection / check, cleaning /painting, and approved repairs should follow the Troubleshooting Section.
维护实践包括维修、拆卸安装、调整/测试检查/检查、清洁/喷漆和经批准的维修,应遵循故障排除部分。
inspection/check.
include servicing removal/installation, adjustment/test,
cleaning/painting. Approved repairs should be located after the Troubleshooting Section.
答案解析
相关题目
336 、 When you replace a word, always make sure that the alternative you select does not change the
meaning of the sentence.
335、Dents are not permitted if they prevent correct operation of the parts. 如果压痕妨碍零件的正确操作,
则不允许有压痕。
334、 如果使用折合页,当折叠时,页码必须是可现的。
333、 Excessive HP fuel supplies, other than that for actuator control and metered fuel to the combustor, is
returned to the LP system via the spill valve.
332、The ADS consists of three separate autopilot channels and a single Mode Control Panel.
331、Basically, it is a guide to industry standardization of proven concepts to be presented in a form most
useful to pilots.
基本上,它是一份行业标准化指南,以一种对飞行员最有用的形式提出已证实的概念。
330、 禁止使用任何非受控的技术文件去做维修工作。
329、Send five copies of the defect report to the engineering authority
328、Make sure that the movement of the elevators is slow.
327、If the left CMC fails, automatic switching occurs so that the right CMC provides the outputs.