相关题目
单选题
130.The minimum timebetweenchecksistwo minutes.
单选题
129.It ispermitted touse alternate materials.
单选题
128.Do not usethesecleaning agents onhot surfaces
单选题
127.To get thecorrectclearance,add special shims,as necessary.
单选题
126.Make surethat youremove all tools and equipment
单选题
125.A review of test results applicabletothe design was made
单选题
124.Inspectiontimes will beadjusted for any severe problems.
单选题
123.Isolatethesection that iscausing the trouble.
单选题
122.A list ofPage Effectivity should be provided in the front of eachManual
单选题
121.The Prefacecontains the following information
