A、 Migrate the acquired company's virtual machines into the vSphere environment as it will currently fit.
B、 Use the current budget to add memory to the cluster to increase each ESXi host's capacity and add the new virtual machines.
C、 Purchase extra hosts to add to the cluster in anticipation of adding the acquired company's virtual machines.
D、 Purchase new licenses for some of the acquired company's ESXi hosts and add them to the cluster to hold the acquired company's virtual machines.
答案:B
A、 Migrate the acquired company's virtual machines into the vSphere environment as it will currently fit.
B、 Use the current budget to add memory to the cluster to increase each ESXi host's capacity and add the new virtual machines.
C、 Purchase extra hosts to add to the cluster in anticipation of adding the acquired company's virtual machines.
D、 Purchase new licenses for some of the acquired company's ESXi hosts and add them to the cluster to hold the acquired company's virtual machines.
答案:B
A. Two
B. Three
C. One
D. None
A. Work with the build team to create a local content library for each vSphere environment. Import the OVF images when new image are published to the repository.
B. Create a local content library for the primary vSphere environment in each data center.Create a subscribed content library for each additional vSphere environment in each data center. Configure the content library to download content automatically.
C. Work with the build team to automate a JSON-based manifest to the repository when changes occur in the repository. Create a subscribed content library for each vSphere environment. Configure the content library to download content when needed.
D. Work with the build team to automate a JSON-based manifest to the repository when changes occur in the repository.Create a subscribed content library for each vSphere environment.Configure the content library to download content automatically.
A. A design diagram illustrating the configuration and specific attributes, such as IP addresses
B. A list of requirements, constraints, and risks
C. A solution architecture diagram with the components and data flow
D. An entity relationship diagram describing upstream and downstream dependencies for specific service components
A. Performance
B. Manageability
C. Recoverability
D. Availability
During the initial meeting with the service owner and business sponsor, the customer has provided the following information to help inform the design:
The solution must support the concurrent running of 1,000 virtual machines.
The production environment must be delivered across two geographically dispersed data centers.
All virtual machines must be capable of running in either data center.
The two data centers are currently connected to each other through a single but diversely routed, high bandwidth and low latency link.
The link between the two data centers is capable of supporting a round-trip time (RTT) of 150 ms.
The existing server hardware standard document states that all virtual infrastructure hosts must be deployed using vSAN ReadyNodes.
The service owner has stated that it is critical to ensure the availability target of 99.9%.
All virtual machine backups must be completed using the existing backup service.
The recovery time objective (RTO) for the service is five minutes.
The recovery point objective (RPO) of the service is four hours.
Which two elements represent risks to the successful delivery of this solution? Choose two.
A. The use of only two data centers
B. The network connectivity between data center sites
C. The use of vSAN ReadyNodes
D. The RTT on the link between the two data centers
E. The use of the existing backup service
A. NVIDIA vGPU
B. AMD MxGPU
C. vSphere DirectPath I/O
D. vSGA
E. vSphere Bitfusion
A. Two new Fibre Channel storage arrays will be deployed, one at either site.Each application tier will be initially provisioned a new LUN.Data replication will be offloaded to the new arrays.
B. Two new vSphere clusters enabled with vSAN will be deployed, one at either site.vSAN will be used to provide policy-based management for each application tier.vSphere Replication will be used to replicate the virtual machine data in an asynchronous configuration.
C. Two new ISCSI storage arrays will be deployed, one at either site.Each application tier will be initially provisioned a new LUN.Data replication will be offloaded to the new arrays.
D. Two new storage arrays will be deployed, one at either site. vSphere Volumes (vVOLs) will be used to provide policy-based management for each application tier.Data replication will be offloaded to the new arrays.
A. Three
B. Five
C. Four
D. Two
解析:解析:CPU: (60+60*0.45)/36 =2.4,RAM: (1152+1152*0.45)/512 = 3.2
A. VMWSATPLOCAL local devices
B. VMWPSPMRU active-passive storage devices
C. VMWSATPDEFAULTAA Generic SATP for active-active arrays
D. VMWPSPFIXED The default policy for active-active storage devices
A. IOPs limits enabled
B. RAID 1
C. Deduplication and Compression disabled
D. RAID 5/6
E. Deduplication and Compression enabled