单选题
)
35.A customer is deploying a new cluster and wants to be able to patch and update two hosts in parallel. The cluster must be able to maintain N+1 resiliency across the remaining hosts while patching activities are performed. The current expected utilization of the platform requires a minimum of two hosts to support all of the virtual machines.
What is the minimum number of hosts the customer will require in the cluster in order to meet the required resiliency level?

A、  Five

B、  Six

C、  Four

D、  Seven

答案:A

试题通
虚拟化高级试题题库4
试题通
6.An architect is designing a new vSphere environment to meet the following requirements:
The environment must support 5000 virtual machines.
The environment will be built initially using 350 hosts.
Which vCenter Server appliance deployment size should the architect specify for the design?
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722e-bff0-c0f9-29e3bb5dbe00.html
点击查看题目
58.Which requirement would be classified as a functional requirement within the design documentation?
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-ae38-c0f9-29e3bb5dbe00.html
点击查看题目
20.Following a company merger, there are two data centers running vSphere environments. Both data centers are leveraging separate Layer 3 vMotion networks.
Which requirement must be met in order to enable vMotion migration between these locations?
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-0258-c0f9-29e3bb5dbe00.html
点击查看题目
84.An architect decides to separate virtual desktops and application servers into separate vSphere clusters to meet security and management requirements.
What are two implications of this design decision? Choose two.
https://www.shititong.cn/cha-kan/shiti/0005ee2e-7230-36f0-c0f9-29e3bb5dbe00.html
点击查看题目
33.During a requirements gathering workshop, the customer provides the following requirement that is pertinent to the design of a new vSphere environment:
The Maximum Tolerable Downtime ( ) for all Tier 1 applications is one hour.
Which requirement classification is being gathered for the design documentation?
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-48a8-c0f9-29e3bb5dbe00.html
点击查看题目
19.During a requirements gathering workshop, the customer’s Chief Information Security Office ( CISO) provides the following requirements that are pertinent to the design of a new vSphere environment:All operating system critical patches must be installed within 24 hours of release;All virtual machine templates must be updated every three months in line with company policy.

Which requirement classification is being gathered for the design documentation?

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722e-fe70-c0f9-29e3bb5dbe00.html
点击查看题目
81.An architect is designing a vSphere environment for a customer and learns that the customer has:
https://www.shititong.cn/cha-kan/shiti/0005ee2e-7230-2750-c0f9-29e3bb5dbe00.html
点击查看题目
7.An architect is designing the expansion of an existing vSphere 7 environment. The customer is requesting a design for a new cluster to support the anticipated future business growth. The requirements specified for the existing environment design must be considered when designing the new cluster.
The existing design has the following requirements:
REQ01 The environment has an availability target of 99.5% for all infrastructure.
REQ02 The recovery time objective ( ) for Tier 1 virtual machines is one hour.
REQ03 Windows and Linux virtual machines must reside on separate clusters.
REQ04 Access to the management cluster within the environment must be controlled.
Which of the listed requirements would be classified as a functional requirement?
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722e-bff0-c0f9-29e3bb5dbe01.html
点击查看题目
36.A new vSphere platform is being created. The platform will host virtual machines that will run management services and line-of-business applications.
What should the architect consider when designing the number and type of clusters required?
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-5460-c0f9-29e3bb5dbe01.html
点击查看题目
34.Refer to the exhibit.
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-4c90-c0f9-29e3bb5dbe00.html
点击查看题目
首页
>
IT互联网
>
虚拟化高级试题题库4
题目内容
(
单选题
)
手机预览
试题通
虚拟化高级试题题库4

35.A customer is deploying a new cluster and wants to be able to patch and update two hosts in parallel. The cluster must be able to maintain N+1 resiliency across the remaining hosts while patching activities are performed. The current expected utilization of the platform requires a minimum of two hosts to support all of the virtual machines.
What is the minimum number of hosts the customer will require in the cluster in order to meet the required resiliency level?

A、  Five

B、  Six

C、  Four

D、  Seven

答案:A

试题通
分享
试题通
试题通
虚拟化高级试题题库4
相关题目
6.An architect is designing a new vSphere environment to meet the following requirements:
The environment must support 5000 virtual machines.
The environment will be built initially using 350 hosts.
Which vCenter Server appliance deployment size should the architect specify for the design?

A.   Large

B.   Small

C.   X-Large

D.   Medium

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722e-bff0-c0f9-29e3bb5dbe00.html
点击查看答案
58.Which requirement would be classified as a functional requirement within the design documentation?

A.   The system must perform virtual machine backups through an API.

B.   Virtual machines must be patched within one month of the patch release date.

C.   Virtual machines must be restarted within 30 minutes of a host failure.

D.   The system must be able to scale to support 500 concurrent virtual machines.

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-ae38-c0f9-29e3bb5dbe00.html
点击查看答案
20.Following a company merger, there are two data centers running vSphere environments. Both data centers are leveraging separate Layer 3 vMotion networks.
Which requirement must be met in order to enable vMotion migration between these locations?

A.   The vMotion service must be configured on the Management VMkernel adapter

B.   A dedicated TCP/IP stack for vMotion with a dedicated gateway must be configured

C.   A stretched vMotion network must be configured between data centers

D.   Virtual machines must be powered off in order to migrate them between data centers

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-0258-c0f9-29e3bb5dbe00.html
点击查看答案
84.An architect decides to separate virtual desktops and application servers into separate vSphere clusters to meet security and management requirements.
What are two implications of this design decision? Choose two.

A.   There will be an increase in management overhead.

B.   Identical hardware must be procured for all hosts.

C.   There will be a reduction in performancd.

D.   The patching cycles will affect both clusters at the same time.

E.   There will be additional licensing and cost requirements for both clusters.

https://www.shititong.cn/cha-kan/shiti/0005ee2e-7230-36f0-c0f9-29e3bb5dbe00.html
点击查看答案
33.During a requirements gathering workshop, the customer provides the following requirement that is pertinent to the design of a new vSphere environment:
The Maximum Tolerable Downtime ( ) for all Tier 1 applications is one hour.
Which requirement classification is being gathered for the design documentation?

A.   Manageability

B.   Performance

C.   Availability

D.   Recoverability

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-48a8-c0f9-29e3bb5dbe00.html
点击查看答案
19.During a requirements gathering workshop, the customer’s Chief Information Security Office ( CISO) provides the following requirements that are pertinent to the design of a new vSphere environment:All operating system critical patches must be installed within 24 hours of release;All virtual machine templates must be updated every three months in line with company policy.

Which requirement classification is being gathered for the design documentation?

A.   Security

B.   Manageability

C.   Recoverability

D.   Availability

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722e-fe70-c0f9-29e3bb5dbe00.html
点击查看答案
81.An architect is designing a vSphere environment for a customer and learns that the customer has:

A.   Use Storage DRS.

B.   Use VMDK anti-affinity rules.

C.   Use multiple datastores for heartbeat.

D.   Use a minimum of three storage arrays.

E.   Use VM to host DRS rules.

https://www.shititong.cn/cha-kan/shiti/0005ee2e-7230-2750-c0f9-29e3bb5dbe00.html
点击查看答案
7.An architect is designing the expansion of an existing vSphere 7 environment. The customer is requesting a design for a new cluster to support the anticipated future business growth. The requirements specified for the existing environment design must be considered when designing the new cluster.
The existing design has the following requirements:
REQ01 The environment has an availability target of 99.5% for all infrastructure.
REQ02 The recovery time objective ( ) for Tier 1 virtual machines is one hour.
REQ03 Windows and Linux virtual machines must reside on separate clusters.
REQ04 Access to the management cluster within the environment must be controlled.
Which of the listed requirements would be classified as a functional requirement?

A.   The environment has an availability target of 99.5% for all infrastructure

B.   The recovery time objective (RTO) for Tier 1 virtual machines is one hour

C.   Access to the management cluster within the environment must be controlled

D.   Windows and Linux virtual machines must reside on separate clusters

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722e-bff0-c0f9-29e3bb5dbe01.html
点击查看答案
36.A new vSphere platform is being created. The platform will host virtual machines that will run management services and line-of-business applications.
What should the architect consider when designing the number and type of clusters required?

A.   Maximum tolerable downtime

B.   Predicted platform growth

C.   Auditing requirements for the virtual machines

D.   The level of isolation required between virtual machine classifications

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-5460-c0f9-29e3bb5dbe01.html
点击查看答案
34.Refer to the exhibit.

A.   Use explicit failover order with pNIC0 as Active for ESXi Management and VM Network.
Use explicit failover order with pNIC1 as Active for backup network.
Use explicit failover order with pNIC2 as Active for vMotion.
Use explicit failover order with pNIC3 as Active for replication.

B.   Use the Route Based on IP Hash for ESXi management and VM network.
Use the Route Based on IP Hash for backup network.
Use the Route Based on the Originating Virtual Port for vMotion.
Use failover with pNIC3 as Active for replication.

C.   Create a link aggregation group (LAG) for vDS01.
Use the Route Based on Physical NIC Load for vMotion.
Use the Route Based on Physical NIC Load for replication.

D.   Use the Route Based on IP Hash for ESXi management and VM network.
Use failover with pNIC1 as Active for backup network.Create a link aggregation group (LAG) for vDS02.

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-4c90-c0f9-29e3bb5dbe00.html
点击查看答案
试题通小程序