A、 A new vCenter Server will be deployed for each branch site
B、 A new host and cluster folder will be created for each branch site
C、 The automation script will be updated to reflect unique naming for each site
D、 A new virtual data center will be created for each branch site
答案:D
A、 A new vCenter Server will be deployed for each branch site
B、 A new host and cluster folder will be created for each branch site
C、 The automation script will be updated to reflect unique naming for each site
D、 A new virtual data center will be created for each branch site
答案:D
A. Create smaller datastores to balance space with Storage DRS
B. Use a larger number of storage profiles (varied disk speeds and RAID levels) to improve performance
C. Create larger datastores to balance space with Storage DRS
D. Create more datastores within each Storage DRS cluster to balance space and performance
A. VMWSATPLOCAL local devices
B. VMWPSPMRU active-passive storage devices
C. VMWSATPDEFAULTAA Generic SATP for active-active arrays
D. VMWPSPFIXED The default policy for active-active storage devices
A. Configure vSphere HA--Configure % based admission control--Configure two isolation addresses--Consider an OEM with NIC failure conditions in their Proactive HA plugin
B. Configure vSphere HA--Consider an OEM with NIC failure conditions in their Proactive HA plugin
C. Configure vSphere HA--Configure two existing data stores for heartbeat--Consider an OEM with NIC failure conditions in their Proactive HA plugin
D. Configure Proactive HA--Automation Level: Automated--Remediation: Maintenance mode for all failures--Consider an OEM with NIC failure conditions in their Proactive HA plugin
A. Site Recovery Manager
B. Snapshots
C. vSAN Metro Cluster
D. vSphere Data Protection
E. vStorage APIs for Array Integration (VAAI)
A. The virtual infrastructure environment must connect application virtual machines and management services to new physical network switches
B. The virtual infrastructure environment must connect application virtual machines and management services to separate distributed virtual switches (DVS)
C. The virtual infrastructure environment must connect application virtual machines and management services to separate VLANs
D. The virtual infrastructure environment must connect management services to a vSphere standard switch (VSS)
Given the information from the customer, which two would be classified as assumptions within the design? Choose two.
A. The backup service will store data in a secure facility
B. The backup service has sufficient capacity for the new requirements
C. The customer will update their hardware standard to support rack mount servers
D. All virtual machines will be deployed with the same resource profile for production and development
E. The clusters will have a minimum redundancy of N+1
G.
A. Use different logical networks to ensure traffic is isolated with separate VLANs
B. Use Network I/O Control and ensure appropriate share value is defined for different types of traffic giving priority to the virtual machines traffic
C. Use two dedicated virtual switches with a single adapter each, dedicating one virtual switch for Management, vMotion, vSAN and Fault Tolerance traffic, and the second one for virtual machine traffic
D. Use a NIC teaming policy based on the physical NIC load
The following information is noted:
They have a single four-port (2 × 10 GbE and 2 × 1 GbE) NIC per ESXi host.
All top-of-rack (ToR) switches are 10 GbE and fully populated.
The backup traffic must not impact existing services .
Which two recommendations should the architect make to help the customer incorporate the service?Choose two.
A. Enable and tag traffic on the backup distributed port group
B. Add a new two-port 10 GbE NIC per ESXi host
C. Replace the existing NIC with a two-port 25 GbE NIC per ESXi host
D. Match the Class of Service (CoS) and Differentiated Services Code Point (DSCP) values to the physical network
E. Create a new virtual switch using the 1 GbE uplinks
G.
A. The ESXi hosts will leverage Fibre Channel (FC).
B. The ESXi hosts will leverage iSCSI.
C. The ESXi hosts will leverage Fibre Channel over Ethernet (FCoE).
D. The ESXi hosts will leverage NFS.
A. An increase in the recovery time objective (RTO) for the cluster
B. Faster to reach the limit of virtual machines per host
C. An overall reduction in the license costs for the cluster
D. Less potential impact to virtual machines during a single host failure