相关题目
vendors/ screw/ washer/ frame/cover/
The term "NP" means that the part is not procurable. Order next higher assembly.
5.Place the leads of the megohmeter as indicated in Figure 1001 , check from the outer case (1) to each cell terminal.
4.Coat all nuts ( 11 ) and links 22 to 27 ) with Neutral petroleum jelly (use a painbrush).
3.Clean the connector (28) pins with Rubbing alcohol (isopropyl) to clean off any accumulated grease and /or dirt.
2.BE CAREFUL WHEN HANDLING ELECTROLYTE AND AVOID SPLASHING.
1.Inspect the battery, make sure there is no evidence of electrolyte leakage. If there is electrolyte leakage, do a general overhaul.
以下不属于交接到位的基本要求的是
以下不属于准备到位内容的是
以下不属于准备到位内容的是
