相关题目
5.Ensure that when push the “Lamp Test” switch, all lights must illuminate.
4.Insert the syringe (T02) with the nozzle into the cell opening until the shoulder of the nozzle rests on the vent valve seat .
3.Coat all nuts ( 11 ) and links 22 to 27 ) with Neutral petroleum jelly (use a painbrush).
2.The oven control module is installed on top of the oven.
1.Make sure the minimum resistance is not less than 2 MΩ .
SRM/ IPC/ SB/ WDM/ AMM/
Perform a functional test as per CMM / testing section of the oven and check that the blower fan does not carve onto the baffle plate.
ESPM/ASM/SRM/ SSM/ AMM/
The right/left buttons allow you to access the subsequent and previous available sequences respectively.
副翼、燃油泵、窗、气象雷达、天线
