22.In these conditions,neither the mechanical nor the electrical pitch trim systems will operate.

A、 在这些情况下,俯仰的机械配平和电配平系统都将不工作。

B、 当出现以下这些情况,俯仰的机械配平和电配平系统都将继续工作。

C、 在这些情况下,电配平系统都将继续工作,俯仰的机械配平不再工作。

答案:A

试题通
英语试题练习考试
试题通
1、在断开组件件之前,先将系统进行排气。
https://www.shititong.cn/cha-kan/shiti/0005e7c1-99d3-bc40-c07f-52a228da6014.html
点击查看题目
18.The Specification contains little new material or novel approaches.
https://www.shititong.cn/cha-kan/shiti/0005e7c1-9a60-21a8-c07f-52a228da6020.html
点击查看题目
19.Because of the varied mission the airplanes performed, type of care given, and age and utilization rates, ABC has determined,based on inspections, tests, and analyses ,that it is prerequisite to provide addition inspection requirement to further ensure that the airplanes can continue to carry the design loads it was originally certified for.
https://www.shititong.cn/cha-kan/shiti/0005e7c1-9b21-7da8-c07f-52a228da6012.html
点击查看题目
62,Apply two layers of protective compound to prevent hydraulic fluid damage to the sealant
https://www.shititong.cn/cha-kan/shiti/0005e7c1-9a60-0e20-c07f-52a228da6005.html
点击查看题目
12.If you shake the solution,do not use it for one hour.
https://www.shititong.cn/cha-kan/shiti/0005e7c1-9a60-2590-c07f-52a228da6009.html
点击查看题目
16.The Specification was developed with the objective of minimizing the cost to,and efforts of general aviation airplane owners and operators and maintenance personnel by standardizing the format and general content of Continuing Airworthiness Programs.
https://www.shititong.cn/cha-kan/shiti/0005e7c1-9b21-75d8-c07f-52a228da6013.html
点击查看题目
230.Calibrated Airspeed(CAS)is to be used only as necessary to comply with any applicable requirements of the certificating authority as the pilot works exclusively with Indicated Airspeed(IAS).
https://www.shititong.cn/cha-kan/shiti/0005e7c1-9a60-19d8-c07f-52a228da6001.html
点击查看题目
9.The pump is installed on rib 3,aft of the front spar..
https://www.shititong.cn/cha-kan/shiti/0005e7c1-9a60-1dc0-c07f-52a228da6000.html
点击查看题目
23.Lifting and shoring part includes procedures covering maintenance,overhaul and repair,removal and replacement,as well as abnormal conditions such as belly landing,nose landing,etc.
https://www.shititong.cn/cha-kan/shiti/0005e7c1-9a60-2590-c07f-52a228da6003.html
点击查看题目
236.''Maintenance Practices”which are a combination of servicing,removal/installation,adjustment/test,inspection/check,cleaning/painting,and approved repairs should follow the Troubleshooting Section.
https://www.shititong.cn/cha-kan/shiti/0005e7c1-9a60-19d8-c07f-52a228da6007.html
点击查看题目
首页
>
在校教育
>
英语试题练习考试
题目内容
(
单选题
)
手机预览
试题通
英语试题练习考试

22.In these conditions,neither the mechanical nor the electrical pitch trim systems will operate.

A、 在这些情况下,俯仰的机械配平和电配平系统都将不工作。

B、 当出现以下这些情况,俯仰的机械配平和电配平系统都将继续工作。

C、 在这些情况下,电配平系统都将继续工作,俯仰的机械配平不再工作。

答案:A

试题通
分享
试题通
试题通
英语试题练习考试
相关题目
1、在断开组件件之前,先将系统进行排气。

A.  Deflate the system before you disconnect the components.

B.  Bleed the system before you disconnect the components.

C.  Bleed the system before you interrupt the components.

https://www.shititong.cn/cha-kan/shiti/0005e7c1-99d3-bc40-c07f-52a228da6014.html
点击查看答案
18.The Specification contains little new material or novel approaches.

A.  规范中包含一些新的材料和方法。

B.  规范中几乎没有包含什么新材料或新方法。

C.  规范中既不包含新材料,也不包含新方法。

https://www.shititong.cn/cha-kan/shiti/0005e7c1-9a60-21a8-c07f-52a228da6020.html
点击查看答案
19.Because of the varied mission the airplanes performed, type of care given, and age and utilization rates, ABC has determined,based on inspections, tests, and analyses ,that it is prerequisite to provide addition inspection requirement to further ensure that the airplanes can continue to carry the design loads it was originally certified for.

A.  ABC has determined the varied mission the airplanes performed, type of care given, and age
and utilization rates because providing additional inspection requirements is prerequisite to further ensure that the airplanes can continue to carry the design loads it was originally certified for based on inspections, tests, and analyses.

B.  ABC has determined that providing additional inspection requirements is prerequisite to further ensure that the airplanes can continue to carry the design loads it was originally certified for based on inspections, tests, and analyses)because of the varied mission the airplanes performed, type of care given, and age and utilization rates.

C.  further ensure that the airplanes can continue to carry the design loads it was originally certified for, owing to the diversified mission the airplanes performed, type of care given, and age and utilization rates, ABC has determined that providing additional inspection requirements is necessary based on inspections, tests, and analyses

https://www.shititong.cn/cha-kan/shiti/0005e7c1-9b21-7da8-c07f-52a228da6012.html
点击查看答案
62,Apply two layers of protective compound to prevent hydraulic fluid damage to the sealant

A.  涂上两层保护性化合物,防止液压油损害密封胶。

B.  涂上两层保护密封胶,以防止液压油损害混合物

C.  在无保护的表面涂上两层密封胶,防止液压油损害化合

https://www.shititong.cn/cha-kan/shiti/0005e7c1-9a60-0e20-c07f-52a228da6005.html
点击查看答案
12.If you shake the solution,do not use it for one hour.

A.  如果摇晃了溶液,一小时不要使用。

B.  如果摇晃了溶液,不要在一小时后使用。

C.  如果摇晃了溶剂,不要在一小时内使用。

https://www.shititong.cn/cha-kan/shiti/0005e7c1-9a60-2590-c07f-52a228da6009.html
点击查看答案
16.The Specification was developed with the objective of minimizing the cost to,and efforts of general aviation airplane owners and operators and maintenance personnel by standardizing the format and general content of Continuing Airworthiness Programs.

A.  The objective of minimizing the cost to,and efforts of general aviation aiiplane owners and operators personnel is to develop the Specification by standardizing the foiTnat and general content of Continuing Airworthiness Programs

B.  The purpose of developing the Specification is to minimize the cost to,and efforts of general aviation airplane owners and operators and maintenance personnel by the standardization of the format and general content of Continuing Airworthiness Programs

C.  The aim of making the Specification is to standardizing the format and general content of Continuing Airworthiness Programs by minimizing the cost to,and efforts of general aviation airplane owners and operators and maintenance personnel

https://www.shititong.cn/cha-kan/shiti/0005e7c1-9b21-75d8-c07f-52a228da6013.html
点击查看答案
230.Calibrated Airspeed(CAS)is to be used only as necessary to comply with any applicable requirements of the certificating authority as the pilot works exclusively with Indicated Airspeed(IAS).

A.  修正空速(CAS)仅为按需使用,以符合认证机构的任何对应要求,因为飞行员延程飞行时需按照指示空速(IAS)工作。

B.  修正空速(CAS)仅在紧急情况时使用,以符合认证机构的任何对应要求,因为飞行员不能按照指示空速(IAS)I 作;

C.  修正空速(CAS)仅在必要时使用,以符合认证机构的任何対应要求,因为飞行员完全按照指示空速(IAS)工作。

https://www.shititong.cn/cha-kan/shiti/0005e7c1-9a60-19d8-c07f-52a228da6001.html
点击查看答案
9.The pump is installed on rib 3,aft of the front spar..

A.  泵安装在 3 号翼肋,黑搓着前翼梁。

B.  泵安装在 3 号翼肋,位于前翼梁的后部。

C.  泵安装在 3 号翼粱,位于后翼肋的前面

https://www.shititong.cn/cha-kan/shiti/0005e7c1-9a60-1dc0-c07f-52a228da6000.html
点击查看答案
23.Lifting and shoring part includes procedures covering maintenance,overhaul and repair,removal and replacement,as well as abnormal conditions such as belly landing,nose landing,etc.

A.  顶升和支撑部分包括维护、大修和维修,拆卸和更换程序,以及比如腹部着地、机头着地等异常情况。

B.  顶升和支撑部分包括维护、大修和维修程序,拆卸和更换以及比如腹部着地、机头着地等异常情况。

C.  顶升和支撑部分包括维护程序,大修和维修,拆卸和更换,以及比如腹部着地、机头着地等异常情况。

https://www.shititong.cn/cha-kan/shiti/0005e7c1-9a60-2590-c07f-52a228da6003.html
点击查看答案
236.''Maintenance Practices”which are a combination of servicing,removal/installation,adjustment/test,inspection/check,cleaning/painting,and approved repairs should follow the Troubleshooting Section.

A.  ”'维修施工”包括维修、拆卸/安装、道应 Z 测试、检验/检查、清洁/喷漆和故障排除部分准的修理。

B.  ”维修施工”包括勤务、拆卸/安装、调节/测试、检验/检查、清洁/喷漆及批准修理,且遵循故障 排除部分。

C.  ”维修施工”包括维修、拆卸/重装、调节/测试、检验/检查、清洁/喷漆或故障排除部分准的修理。