单选题

Orders for a specific assembly have been released over the last two weeks; stockroom personnel have reported unplanned issues for one component and return of another components. Which of the following is the most likely causes of this situation?

A
There are errors in the inventory records for the two components
B
Material availability checking is not being performed before release of the orders
C
An engineering change for the assembly is not in the BOM
D
The master scheduling horizon is not long enough

答案解析

正确答案:C

解析:

Product design engineers may have changed the components used in the product without updating the BOM;
题目纠错
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码