In a manufacturing environment using a push system, which of the following planning tools would most likely drive the process?

A
Lean-based production methods
B
Reorder point control
C
DRP-based inventory management
D
MRP-based production activity control

答案解析

正确答案:D

解析:

In a production environment, MRP is used identify production and then to push production orders to the plant floor and then to continuously reschedule them until completion.
DRP is considered as pull system whereby demand from satellite warehouses is placed on supplying facilities;
Reorder points is a very poor planning method for production control and should not be used;
题目纠错
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码