Company ABC trying to calculate how much safety stock they should have for their highest selling product. With the follow information calculate the safety stock.
Standard deviation=25
Safety factor=4.00
Lead time=4 weeks
Forecast of 250 per week
Which of the following are basic methods of managing a contract?
1. Vendor scheduling
2. Direct shipment
3. Release system
Which of the following are lead time elements:
1. Set-up time
2. Buffer time
3. Run time
4. Drum time
All of the following are batching rules EXCEPT
What demand fluctuates around an average demand?
What type of scheduling is the typical method used for MRP logic?
Which of the following is not a benefit of RFID technology?
The direct definition of the capability of a system to perform its expected function is called what?
All the following would be typical applications of linear programming EXCEPT
What are the cost elements of WIP inventory?
1. Scrap
2. Material
3. Labor
4. Overhead