An example of using the poka-yoke technique in process design is
答案解析
相关题目
What type of engineer is their function to produce a product at the right quality economically and consistently?
When looking at BOM, under APICS rules, assembly part numbers are shown as what?
Which of the following would be included in the item master file?
1. Manufacturing lead time
2. Quantity on order
3. Safety stock
4. Balance on hand
What type of scheduling uses a particular operation to schedule from?
Company ABC trying to calculate how much safety stock they should have for their highest selling product. With the follow information calculate the safety stock.
Standard deviation=25
Safety factor=4.00
Lead time=4 weeks
Forecast of 250 per week
Which of the following are basic methods of managing a contract?
1. Vendor scheduling
2. Direct shipment
3. Release system
Which of the following are lead time elements:
1. Set-up time
2. Buffer time
3. Run time
4. Drum time
All of the following are batching rules EXCEPT
What demand fluctuates around an average demand?
What type of scheduling is the typical method used for MRP logic?