The 1st step in the A3 process is to
答案解析
解析:
相关题目
In Synchronous manufacturing what type of system can be used to replenish the line?
When the clean out process at the end of a production run is difficult or long, many companies run two or more batches on after another, this is call:
Which of the following are basic process flow scheduling approaches?
1. VDS-Vendor dominated scheduling
2. PDS-Processor-dominated scheduling
3.MDS-Material-dominated scheduling
What equals direct time charged/Clock time scheduled?
Actual lead time is directly affected by what?
To track a shipment w/o manual inspection would include:
1. RFID
2. EDI
3. Bar code
4. Poka Yoke
A purchase order is signed with ABC company for $3000 worth of materials. The average salary of a buyer is paid $25/hour and manufacturing gets paid $20/hour. If it takes 5 hours for a buyer to set up a purchase order and it takes manufacturing 10 hours to set the job and 40 hours to process the job. How much are the ordering/set up costs for this PO?
Constrains include which of the following:
1. Machine center
2. Material availability
3. Managerial policy
4. Purchase order paperwork
A project plan includes:
1. Assumptions
2. Communication plan
3. Budget
4. Schedule
The forecast of cost of goods sold equals $2.5M in the next 3 months and the projected average inventory for the quarter is $2.0M. What are the predicted stock turns for the upcoming quarter?