A 3-pronged approach to managing quality is the
答案解析
解析:
朱兰三部曲(Juran Trilogy)或品质三部曲(Quality Trilogy) 每个企业、每种产品和服务,要想在国际市场上占有一席之地,都要面对“超严格的质量要求”,要努力使自己达到世界级的质量水平。
Juran trilogy, it's is a system based approach to quality improvement. The three elements of the approach are : Quality Planning, Quality Control and Quality Improvement.
1) Quality Planning: The steps of the quality planning exercise are: - Definition of the project. - Identification of the customers – those who will be impacted by the actions that are taken to complete the project. - Discovery of customer needs. - Development of the product and processes to meet the customer’s needs. - Establishment of the quality objectives. - Development of the plans for meeting these objectives
2) Quality Control; It entails the following steps: - Clear definitions of quality. - Knowledge of the expected performance or targets. - Evaluation of the actual operating performance. - Comparison of the actual performance to goals. - Action of the difference.
3) Quality Improvement; As per Juran Tribology, quality improvement is a disciplined approach that improves the level of performance of the process. This is achieved by a breakthrough improvement in performance; when a new innovation or a completely fresh idea is brought into improve the current performance levels. This ensures that the new levels of performance are achieved, and then quality control mechanisms are in place to sustain that effectively
相关题目
What type of BOM is used to manage by-products?
What are the 3 areas of simulation?
1. Lot order sizing
2. MRP as a simulator
3. "What if" facility
4. Linear programming
What has a demand pattern with large flu cations from one time period to another?
The look a head period is determined by what?
When Rick decides to create a document that shows the information flow and the time for each step he is doing what?
Which of the following are ways to calculate WIP:
1. Value of materials issued-Work completed in time period
2. Average manufacturing lead time times average weekly spend
3. Average manufacturing lead time multiped by work completed
In Synchronous manufacturing what type of system can be used to replenish the line?
When the clean out process at the end of a production run is difficult or long, many companies run two or more batches on after another, this is call:
Which of the following are basic process flow scheduling approaches?
1. VDS-Vendor dominated scheduling
2. PDS-Processor-dominated scheduling
3.MDS-Material-dominated scheduling
What equals direct time charged/Clock time scheduled?