单选题

A likely reason why a process is said to exhibit signs of being out of control is 13 points are on one side of the median is

A
13 points can easily be plotted in a 2-shift or 2-day operation
B
13 points should be equally likely to occur on both sides of the median
C
13 is a typical number used for plotting and easy to remember
D
13 points are statistically required in order to calculate a new median

答案解析

正确答案:B

解析:

The average of all points should approximate the median;
题目纠错
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

In a company that has over 20,000 end items in stock, which of the following demand elements is likely to take the most time to assess for sales and operations planning?

单选题

Which of the following results is most likely to occur in a company that does not use a formal sales and operations planning process?

单选题

Load smoothing at the production planning level to resolve an overload condition identified by resource planning is an example of

单选题

The pre-sales and operations planning process meeting should include

单选题

Which of the following information is necessary for determing the production planning horizon?

单选题

A company produces 500 end items for distribution and sales. Which information could be evaluated prior to the end of the month in order to streamline the sales and operations planning process?

单选题

Which of the following measures best describes performance related to sales and operations planning?

单选题

A MTO company is ready to introduce family that has many of the criteria the market is demanding, which of the follow production strategies is most applicable for the introduction phase of the new product

单选题

A company performs sales and operations planning monthly, with a production planning horizon extending four months into the future on a rolling basis. Business planning is performed annually and reviewed monthly. The longest lead time parts are specially items with a lead time of six weeks. The forecasting horizon length should be

单选题

The objective of sales and operations planning is to

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码