Which of the following result is indicated as the standard deviation becomes smaller through continuous improvement efforts?
答案解析
解析:
相关题目
In a MTS environment, which of the following is the best reason for developing a manpower plan as part of the sales and operations planning process?
In a company that has over 20,000 end items in stock, which of the following demand elements is likely to take the most time to assess for sales and operations planning?
Which of the following results is most likely to occur in a company that does not use a formal sales and operations planning process?
Load smoothing at the production planning level to resolve an overload condition identified by resource planning is an example of
The pre-sales and operations planning process meeting should include
Which of the following information is necessary for determing the production planning horizon?
A company produces 500 end items for distribution and sales. Which information could be evaluated prior to the end of the month in order to streamline the sales and operations planning process?
Which of the following measures best describes performance related to sales and operations planning?
A MTO company is ready to introduce family that has many of the criteria the market is demanding, which of the follow production strategies is most applicable for the introduction phase of the new product
A company performs sales and operations planning monthly, with a production planning horizon extending four months into the future on a rolling basis. Business planning is performed annually and reviewed monthly. The longest lead time parts are specially items with a lead time of six weeks. The forecasting horizon length should be
