相关题目
Which of the following will increase machine utilization?
Which of the following are obstacles to the implementation of Just-in-Time?
I. Management does not allow employees to be involved.
II. The factory takes on too many projects rather than continuous improvement.
III. Spending on education and training is limited.
Which of the following are requirements for a shop order release?
I. Parts availability
II. Order due date
III. Tooling availability
Which of the following are generally in the shop packet?
I. Operation sheets
II. Pick lists
III. Move tickets
All of the following are true regarding a daily dispatch list EXCEPT:
In order to determine the operation duration, which of the following would be included?
I. Setup time
II. Wait time
III. Run time
Which of the following statements are true regarding infinite loading?
I. The technique is valid although the name is misleading
II. The technique is now known as capacity requirements planning
III. It is also known as operations scheduling
A capacity simulation allows a planner to:
Which of the following is affected when input does not match output?
I. Lot sizes
II. Lead times
III. Queue sizes
Which of the following actions should the master scheduler take if the ATP line shows a negative balance?
