AI智能推荐题库-试题通 AI智能整理导入题库-试题通
×
首页 题库中心 CPIM PART2-供应链资格认证考试 题目详情
C93BF00FBEF00001B89720C0D4CE1712
CPIM PART2-供应链资格认证考试
3,028
单选题

A supplier receipt has been rejected due to a sampling inspection process. What should production ask the quality department to do in order to keep the material plan valid?

A
Accept the lot and perform 100% inspection to identify the rejected parts
B
Perform 100% inspection on enough units to satisfy known demand
C
Request the material be replaced by another qualified supplier
D
Expedite new replacement materials to the original required date

答案解析

正确答案:B

解析:

Sample inspection does not mean all parts are defective, continuing to inspect may reveal there are sufficient parts to satisfy production requirements;
题目纠错
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

It is always important to monitor and feedback performance to the suppliers. In a JIT environment, however, supplier performance is vital to the ongoing operation of the business. Deliveries must be made on time, quantities must be exactly right, and quality must be perfect. Shipments are usually made within tight time windows and must be adhered to. Which of the following best describes why the demands are so rigid on a JIT supplier?

单选题

In 1987, an international set of quality standards was developed to help companies effectively document the quality systems elements to maintain an efficient quality system. This set of standards is known as:

单选题

A common measure of product durability is the:

单选题

When purchasing a product, a buyer demands that certain characteristics be present in an acceptable combination in order to consider a product in the running for purchase. These features and values are called:

单选题

There are many obstacles to implementing JIT in a manufacturing environment. Which of the following obstacles would be considered most difficult to overcome?

单选题

Traditional measurements of manufacturing are not as useful in the flow manufacturing environment. Which of the following would be good measures to use?
I. Machine utilization
II. Defect rates
III. Setup times

单选题

Which of the following can be considered factors in the success of an SGIA?
I. Management support and commitment
II. Clear goals always established by management
III. Educating and training all personnel
IV. Recognizing and rewarding the group

单选题

The time required between the completion of each successive end product is called:

单选题

Under full absorption costing, indirect costs would be handled by which of the following methods?

单选题

Which of the following are true regarding variable costing?
I. Fixed factory overhead is not assigned to the product
II. It is acceptable for external financial reporting
III. It is beneficial for internal analysis

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码