相关题目
In order to achieve effective capacity management, which of the following needs to be in place in a company?
I. A cost accounting system to capture variances
II. A material control system
III. A shop floor control system which provides accountability
When there is a linkage of the existing business with directly related products, it is known as:
Turney writes about a process in which work teams develop and apply activity-based information to improve and reengineer their work. These teams are made up of people who work together and interact on a daily basis. This process is called:
There are a number of steps to follow when justifying a large scale project. Which of the following is not one of the steps of justification?
In a continuous flow manufacturer, manufacturing planning and control systems must be able to accommodate which of the following operations?
I. Handling of by-products
II. Assembly operations
III. Salvage materials which must be re-processed
In trying to integrate a company, there are several obstacles to integration. Which of the following is an obstacle to integration?
The WBS (Work Breakdown Structure) is helpful in breaking down a large project into manageable piece. However, it does not address the timing of tasks, etc. into meeting the finish date. For this, a useful tool is a:
Full absorption accounting is best suited for which of the following situations?
Which of the following will most likely reduce the cost of new product development?
Carousels are automated storage and retrieval systems which offer which of the following benefits?
I. Relatively low maintenance costs
II. Flexibility in expansion
III. Relatively high return on investment
