AI智能推荐题库-试题通 AI智能整理导入题库-试题通
×
首页 题库中心 CPIM PART2-供应链资格认证考试 题目详情
C93BF00FBEF00001B89720C0D4CE1712
CPIM PART2-供应链资格认证考试
3,028
单选题

The amount of time an item may be held in inventory before it becomes unusable

A
Lot control
B
Product life cycle
C
Limited lift
D
Shelf life

答案解析

正确答案:D
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

A shop worker performs a task which has a standard time of 12 hours and he finishes in 10 hours. This same worker during this same time was only supposed to work an 8 hour shift, but ended up working a 10 hour shift to help get the project done early. Calculate the rated capacity for a standard 40 hour week using the above job as a baseline?

单选题

The Indoor Store presents the following facts pertaining to the cost of one product carried in its merchandise inventory:
Beginning inventory on hand, 200 units @ $15 = $3,000
Purchase June 1, 200 units @$16 = $3,200
Purchase July 5, 200 units @ $20 = $4,000
Purchase August 25, 200 units @ $25 = $5,000
A new order comes in for 500 units. What is the cost of goods sold that should be recorded using a simple weighted average using the LIFO methodology?

单选题

The difference between a master schedule and a master production schedule is that master production schedule is what?

单选题

Actual lead time is directly affected by what?

单选题

To track a shipment without manual inspection would include which of the following
I. RFID
II. EDI
III. Bar Codes
IV. Poka Yoke

单选题

All of the following are techniques to reduce lead time EXCEPT

单选题

A purchase order is signed with ABC company for $3,000 worth of materials. The average salary of a buyer is paid $25 an hour and manufacturing gets paid $20 an hour.
It takes 5 hours for a buyer to set up a purchase order and it takes manufacturing 10 hours to set up the job and 40 hours to process the job
How much are the ordering/ setup costs for this purchase order?

单选题

What is defined as the amount of planned work scheduled for and actual work released to a facility, work center, or operation for a specific span of time?

单选题

Who should be the only people to make an engineering change request?

单选题

Constraints include which of the following
I. Machine Center
II. Material Availability
III. Managerial Policy
IV. Purchase Order Paperwork

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码