Geller manufacturers a full range of lighting fixtures for the home and office. These are shipped to 4 distribution centers that serve 4 areas of the country. Each distribution center has both automated and manual storage. Which of the following is MOST similar between these 2 areas?
答案解析
解析:
相关题目
Which of the following are basic process flow scheduling approaches?
I. Vendor Dominated Scheduling (VDS)
II. Processor-Dominated Scheduling (PDS)
III. Material-Dominated Scheduling (MDS)
What equals direct time charged/ clock time scheduled?
A shop worker performs a task which has a standard time of 12 hours and he finishes in 10 hours. This same worker during this same time was only supposed to work an 8 hour shift, but ended up working a 10 hour shift to help get the project done early. Calculate the rated capacity for a standard 40 hour week using the above job as a baseline?
The Indoor Store presents the following facts pertaining to the cost of one product carried in its merchandise inventory:
Beginning inventory on hand, 200 units @ $15 = $3,000
Purchase June 1, 200 units @$16 = $3,200
Purchase July 5, 200 units @ $20 = $4,000
Purchase August 25, 200 units @ $25 = $5,000
A new order comes in for 500 units. What is the cost of goods sold that should be recorded using a simple weighted average using the LIFO methodology?
The difference between a master schedule and a master production schedule is that master production schedule is what?
Actual lead time is directly affected by what?
To track a shipment without manual inspection would include which of the following
I. RFID
II. EDI
III. Bar Codes
IV. Poka Yoke
All of the following are techniques to reduce lead time EXCEPT
A purchase order is signed with ABC company for $3,000 worth of materials. The average salary of a buyer is paid $25 an hour and manufacturing gets paid $20 an hour.
It takes 5 hours for a buyer to set up a purchase order and it takes manufacturing 10 hours to set up the job and 40 hours to process the job
How much are the ordering/ setup costs for this purchase order?
What is defined as the amount of planned work scheduled for and actual work released to a facility, work center, or operation for a specific span of time?