To reduce the cost of transaction processing, a repetitive manufacturer first would implement:
Which of the following method is used to sequence jobs planned for production within the same time period?
The implementation of a program designed to reduce changeover times will result in a temporary capacity shortage. This shortage will be handled by using some older equipment and by subcontracting some work. Which of the following methods should the company use to control capacity during this period?
Statistical process control is a technique primarily used to
Which of the following project characteristic would suggest using the PERT technique, rather than the critical path method?
The actual output of a work center for a given time period can be determined by evaluating the:
In a continuous flow environment, it is necessary to report which of the following data from the shop floor?
If an operation on a routing is performed out of sequence and the change in sequence is not reported to the formal system, which of the following situation will occur?
A supplier of roller bearing makes lots of 10,000 and sorts them automatically according to size. In a typical lot of 10,000, the sizes break into the categories: The product requires rollers on target or, at most, 0.0001 oversize. Experience indicates that 100% must be respected before use because the machine inspection lets a few defective units slip through. The supplier should be encouraged to take which of the following actions?
When an order in split into two orders, the immediate effect on a job shop work center is to increase which of the following elements?