A company produces MTS products that are stocked and shipped from distribution centers, to which deliveries are made weekly. No SS is carried, and inventory shows available when it is placed into stock at the distribution center. Which of the following statements is most true of a performance measure based on units completed within the master scheduled weekly period?
答案解析
相关题目
Based on the data provided, assume that time available per day in 840 minutes. What is the takt time per unit of demand?
A company is gathering data as to why the machine is consistently shutting down. What methodology should a company pursue first?
Important and measurable characteristics of a product or process whose performance targets are set by the customer is:
When attempting to understand whether there is a relationship between two variables, which quality control tool should be used?
During the define phase of a six sigma project, which of the following activities takes place?
Manufactured parts are being assembled on a production line at a constant rate when a faulty component in identified. An assembly worker pushes the line stop button and work ceases while the defect is reviewed. This action is an example of:
Managing the constraint in an operation will improve which of the following metrics?
A production manager uses a hoshin plan to communicate:
After some investigation, a packaging company determined that all of its defective containers were being delivered by one of their third-party trucking companies. What quality tool would have been used to find this information?
Structured problem solving providers what essential result to an organization?
