相关题目
During a soldering operation some components were getting damaged due to high temperatures. A fix to eliminate the defect was put into place, which resulted in a (n):
Based on the data provided, assume that time available per day in 840 minutes. What is the takt time per unit of demand?
A company is gathering data as to why the machine is consistently shutting down. What methodology should a company pursue first?
Important and measurable characteristics of a product or process whose performance targets are set by the customer is:
When attempting to understand whether there is a relationship between two variables, which quality control tool should be used?
During the define phase of a six sigma project, which of the following activities takes place?
Manufactured parts are being assembled on a production line at a constant rate when a faulty component in identified. An assembly worker pushes the line stop button and work ceases while the defect is reviewed. This action is an example of:
Managing the constraint in an operation will improve which of the following metrics?
A production manager uses a hoshin plan to communicate:
After some investigation, a packaging company determined that all of its defective containers were being delivered by one of their third-party trucking companies. What quality tool would have been used to find this information?
