Due to a quality problem, only 85% of the master schedule for a finished goods has been produced. A decision to service all customers who have submitted orders according to their percentage of total orders is called
答案解析
相关题目
Which of the following application is an effective use of electronic data interchange?
Group technology identifies the common characteristics of parts on the basis of which of the following factors?
A plant that implements a total preventive maintenance program would be likely to:
Which of the following characteristic are found in a good quality management system?
In an attempt to reduce costs associated with information system transactions, which of the following approaches should be considered?
One of the main benefits of the A3 problem solving method is
Which of the following terms describes a management technique used to evaluate planned changes to production processes?
Which of the following consequences is a result of inaccurate inventory data?
A company produces a part with a nominal diameter of 2.0 inches and a tolerance of ?0.006 with a standard deviation of 0.001 inches. A sample has the average diameter of 1.996 inches with a standard deviation of 0.001 inches. What is the CPK and process capability?
During a soldering operation some components were getting damaged due to high temperatures. A fix to eliminate the defect was put into place, which resulted in a (n):